3 Position Snatch 7X1

(Floor, Hang, Power Position) + 1 Jerk
Starting at 60% and working up
Focus on good technique over weight
Then
12 minute AMRAP with a partner
Partner A – Lunge with a KB (53/35) in the front rack position to end of rig.
Leave the KB at the end and sprint back to partner.
Partner B – Sprint to KB and lunge back to partner with it.